Cutting Steroid Cycle with Cutaxyl 150 Kalpa Pharmaceuticals LTD, India
Cutting Cycles

Cutting Steroid Cycle with Cutaxyl 150

265.00 USD

Cutaxyl 150 cycle for the summer.
Cutaxyl 150 is a mix of 3 compounds (test prop, trenbolone and drostanolone) which are mixed in the right proportions.
This cycle will give use lean muscles growth and better muscle definition. 8 Weeks Cycle

Shipping From:
International

Cutting Steroid Cycle with Cutaxyl 150 Detailed

CUTAXYL 150 STEROID CYCLE

This cycle is simple and straight to the point.

This particular cycle is 8 Weeks Cycle.

Cutaxyl 150 is a mix of 3 compounds (test prop, trenbolone and drostanolone) which are mixed in the right proportions that is why using cutaxyl is simplest way to achieve your goal, you dont need to inject 3 different products but you have all of them in one.

This cycle will give use lean muscles growth and better muscle definition.

A good way to prepare your body for the summer.

Start it with 6,8 or 10 weeks before the time you want to be in shape.

Special workout routine from Huge Tom comes with this cycle.

This particular cutaxyl 150 cycle is enough for 8 weeks and clomixyl as well as needles and syringes are included in package.

PRODUCTS INCLUDED IN THIS CYCLE:

Cutaxyl 150

Clomid

Feel free to contact Huge Tom if you have more questions.

Cutting Steroid Cycle with Cutaxyl 150 Reviews
C
Charles
Apr 26, 2022 (17:34)

What is the best way to take this cycle please

C
Charles
Apr 26, 2022 (17:34)

What is the best way to take this cycle please

j
josh
Jan 22, 2022 (15:52)

As always customer service is through the roof with gbn. They go the extra mile with every question I have and never make me feel stupid for asking. In regards to this particular cycle I combined with win and went a few extra weeks with an extra vial of cutaxyl. My strength was absolutely formidable and explosive as well. Highly recommend, only downside for me was my cardio was pretty bad I would get winded fairly easy but that was also due to a lack of a good cardio regimine on my part. I give it a 5 out of 5 on quality as well. But I'm always a fan for Kalpana. Huge tom is the best he will never lead you down the wrong path.

A
Anthony
May 17, 2021 (10:24)

How soon before your workout do you inject?

A
Anonymous
Feb 1, 2018 (08:53)

Just ordered this for my next cutting cycle.

G
Gerardo
Jun 16, 2016 (05:50)

When will this product be back in stock !!!!

A
Allan
Apr 23, 2016 (12:38)

Is this cycle in stock I want to order now

E
Eli
Jan 10, 2016 (04:42)

Every how long do I inject? and how much do I inject?
also, exactly how much of each compound is in this mix? Can I run it for 10 weeks then start pct with nolva and clomid?

F
Faron
Jun 11, 2014 (23:55)

hey huge tom how long would this last me?

J
Juan
Jun 9, 2014 (21:36)

is this still in stock?

B
Brandon
May 15, 2014 (12:12)

I'd like to know when to start the clomixyl and dosage please . Thanks

A
Anonymous
Apr 5, 2014 (03:50)

Cutaxyl 150 is used at 1ml/EOD so it will be 3-4 injections per week.
I used it for 8 weeks last year before summer and already ordered again for this summer :)

R
Roberto
Apr 4, 2014 (21:23)

i would like to know the dosage and how many inject on one week i need to do

Please log in to write Cutting Steroid Cycle with Cutaxyl 150 review.

Related Offers
10 Weeks Testosterone Cypionate Dragon Pharma, Europe
Dragon Pharma, Europe

10 Weeks Testosterone Cypionate Cycle + PCT

152.00 USD  
Clomiphene Tablets British Dragon Pharmaceuticals
British Dragon Pharmaceuticals

MANUFACTURER: British Dragon Pharmaceuticals
ACTIVE INGREDIENT: Clomiphene Citrate
STRENGTH: 50 mg/tab
AMOUNT: 50 tabs


40.00 USD  
Product Of The Week
Beginner steroid cycle Kalpa Pharmaceuticals LTD, India
Kalpa Pharmaceuticals LTD, India

This is a beginner steroids cycle for muscles growth. Clomid for PCT is included.

Read the description or send us the questions if you have them.

Thank you.

152.00 USD  
Testosterone and Winstrol Cycle Kalpa Pharmaceuticals LTD, India
Kalpa Pharmaceuticals LTD, India

10 weeks summer cycle.
Start this cycle in April or May.

320.00 USD  
Anavar Cycle Kalpa Pharmaceuticals LTD, India
Kalpa Pharmaceuticals LTD, India

Information about Anavar Steroid Cycle

298.00 USD  
12 weeks Primobolan Steroid Cycle Kalpa Pharmaceuticals LTD, India
Kalpa Pharmaceuticals LTD, India

12 Weeks Lean Mass Steroid Cycle + Cutting Workout

1160.00 USD  

Add in Cart - Product(s)

Close Button
Empty

Total Cost: