• Home > Domestic > Testosterone Propionate 8 weeks steroid cycle
  • Back

    Testosterone Propionate 8 weeks steroid cycle

    This is a cutting 8 weeks cycle with Testosterone Propionate.

    PCT is NOT included in this pack!

    236.25 USD

    Out of stock

    DESCRIPTION

    Cutting 8 weeks testosterone propionate cycle

    WEEKS

    1-8 Testosterone Propionate @1ml/EOD

    PCT with Clomid will start 1 week after last injection

    PCT WITH CLOMID
    ==============================
    Day 1 – Clomid 100mg
    Day 2 - Clomid 100mg
    Following 20 days – Clomid 50mg
    *If needed you can take it for 5-7 days more at 25mg/day dosage.
    TABS are taken with food.
    ==============================

  • Reviews

    • No reviews found

    Please log in to write review

  • Related Offers

    • Testolab-P 100

      MANUFACTURER: 7Lab Pharma
      GOAL: Cutting
      TYPE: Injections
      ACTIVE SUBSTANCE: Testosterone Propionate
      STRENGTH: 100mg/ml
      AMOUNT: 10ml vial

      44.63 USD 44.63 USD

    • 14 Weeks Lean Muscles Steroid Cycle

      This 14 weeks cutting cycle will give user quality
      muscle gains and if combined with cardio
      and diet ripped look will be achieved.
      Testosterone Propionate + Primobolan stack

      1548.75 USD 1548.75 USD

    • Testosterone Propionate (10ml)

      Manufacturer: Genetic Pharmaceuticals
      Substance: Testosterone Propionate
      Pack: 10 ml vial (100 mg/ml)

      49.35 USD 49.35 USD

    • Testosterone Propionate (Genetic)

      Manufacturer: Genetic Pharmaceuticals
      Substance: Testosterone Propionate
      Pack: 10 amps (100 mg/ml)

      49.35 USD 49.35 USD

    • Testorox P100

      Manufacturer: ZZerox Pharmaceuticals
      Active Substance: Testosterone Propionate
      Package: 10 amps (100mg/ml)

      46.20 USD 46.20 USD

  •