Cutting Cycles

14 Weeks to Quality,Strength and Lean Muscles

949.75 USD 1224.00 USD

Quality Muscles and Strength steroids cycle. Try something new.

Shipping From:
International
You will save 274.25 USD

14 Weeks to Quality,Strength and Lean Muscles Detailed

Quality muscles and strength steroids cycle

This 14 weeks cycle is very good cycle for those who want to achieve strength and muscular mass keeping in the same time quality.

We will start with 4 weeks of dbol at dosage of 40mg/day, some may opt for 50mg/day.

In the same time we start injecting testosterone enanthate at dosage of 500mg/week split into 2 injections(Monday and Friday). Getting 2 injections per week will keep its level more stable.

Also we start injecting Primobolan (Methenolone Enanthate) at dosage of 600mg week. (split into 3 injections per week).

Last 5 weeks we add Winstrol which will help you attaining that quality you were looking for.

Dbol is used to kickstart the cycle. It is worth mentioning that dbol is toxic for your liver so taking Liv 52 or milk thistle is an important aspect of this cycle.

As a PCT use Nolvadex and Clomid. Also add Vitamin E at least 400mg/day.


Weeks
1-5 Dbol@30mg/day
1-14 Testosterone Enanthate @500mg/week
1-14 Primobolan @600mg/week
7-12 Winstrol Injectable@1ml EOD
14-17 PCT as follow:

Day 1 - Clomixyl 150mg -  in three divided doses.
Day 2 - Clomixyl 100mg -   in two divided doses
Following 10 days - Clomixyl 50mg  - before bed
Following 10 days
- Clomixyl 50mg - before bed

Products included:
Dianoxyl 10 -
Testosterone Enanthate
Primoblan 100
Stanozolol Injectable
Clomid
 

14 Weeks to Quality,Strength and Lean Muscles Reviews
C
Charles
Sep 14, 2016 (02:34)

When will this cycle be in stock?

G
Gerardo
Apr 21, 2016 (23:55)

is this cycle in stock?

J
Juan
Jan 9, 2015 (18:18)

Hi, Team,
I am a new customer, your references and reviews are great and I'm looking forward to getting first hand experience your products.
When will this cycle be in stock , is there an alternative for one? as I am planning to start a cycle for next month. Please advise.

Best regards,

Lefty_7

E
Eugene
May 21, 2013 (14:41)

Whats a good place to pin?

M
My
May 10, 2013 (03:15)

I like it and I did it. Primo is the king and to feel it you need at least 14 weeks.

Please log in to write 14 Weeks to Quality,Strength and Lean Muscles review.

Related Offers
Kalpa Pharmaceuticals LTD, India

10 Week Cutting Cycle. It's time to get in shape before summer.

450.00 USD 600.00 USD
You will save 150.00 USD
US Domestic
Clomiplex Axiolabs
Axiolabs

MANUFACTURER: Axiolabs
GOAL: PCT(restore testosterone production)
TYPE: Tabs
ACTIVE INGREDIENT: Clomiphene citrate
STRENGTH: 50mg/tab
AMOUNT: 50 tabs

30.00 USD 40.00 USD
You will save 10.00 USD
Dianoxyl 10 Kalpa Pharmaceuticals LTD, India
Kalpa Pharmaceuticals LTD, India

MANUFACTURER: Kalpa Pharmaceuticals
GOAL: Bulking
TYPE: Tabs
ACTIVE INGREDIENT: Methandienone
STRENGTH: 10mg/tab
AMOUNT: 100 tabs

33.00 USD 44.00 USD
You will save 11.00 USD
Dianabol 20 Dragon Pharma, Europe
Dragon Pharma, Europe

MANUFACTURER: Dragon Pharma, Europe
GOAL: Bulking
TYPE: Tabs
ACTIVE INGREDIENT: Methandienone
STRENGTH: 20mg/tab
AMOUNT: 100 tabs

60.00 USD  
Kalpa Pharmaceuticals LTD, India

6 Weeks Cutting Steroid Cycle [testosterone propionate]

120.00 USD 160.00 USD
You will save 40.00 USD

Add in Cart - Product(s)

Close Button
Empty

Total Cost: